MIL-PRF-13312R
TABLE I. Verification methods
Title
Requirement
Verification
Title
Requirement
Verification
OPERATING
3.3
4.3.2
Finish
3.4.5
4.3.3.5
REQUIREMENTS
4-hour operation
3.3.1
4.3.2.1
Marking
3.4.6
4.3.3.6
72-hour operation
3.3.2
4.3.2.2
Identification plate
3.4.6.1
4.3.3.6.1
Refrigeration capacity
3.3.3
4.3.2.3
Instruction plates
3.4.6.2
4.3.3.6.2
Defrost system
3.3.4
4.3.2.4
Electrical instruction plate
3.4.6.2.1
4.3.3.6.2.1
Moisture content
3.3.5
4.3.2.2d
Control and gage nameplates
3.4.6.3
4.3.3.6.3
Refrigerant leakage
3.3.6
4.3.2.2d
Electrical wiring
3.4.6.4
4.3.3.6.4
Operation time (type
3.3.7
4.3.2.2e
Interchangeability
3.4.7
4.3.3.7
I)
3.5
4.3.4
Design reliability
3.3.8
4.3.2.5
OPERATING
ENVIRONMENT
REQUIREMENTS
3.3.9
4.3.2.6
Ambient temperature
3.5.1
4.3.4.1
Ozone-depleting
substances
Temperature control
3.3.10
4.3.2.7
Rainfall
3.5.2
4.3.4.2
Diesel engine
3.3.11
4.3.2.8
Shock and vibration
3.5.3
4.3.4.3
operation (type I)
Compressor operation
3.3.12
4.3.2.9
Electromagnetic compatibility
3.5.4
4.3.4.4
(type II)
Safety
3.3.13
4.3.2.10
Storage conditions
3.5.5
4.3.4.5
3.4
4.3.3
Noise level
3.5.6
4.3.4.6
OWNERSHIP AND
SUPPORT
REQUIREMENTS
Weight
3.4.1
4.3.3.1
Corrosion resistance
3.5.7
4.3.4.7
3.6
4.3.5
Transportability
3.4.2
4.3.3.2
INTERFACE
REQUIREMENTS
Control panel
3.4.3
4.3.3.3
3.4.4
4.3.3.4
Service and
maintenance
4.1.2 Conformance inspection. Conformance inspection of the refrigeration units shall consist of
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business