MIL-PRF-13312R
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
Standard No. 70 - National Electrical Code
(Application for copies should be addressed to the National Fire Protection Association, One
Battery March Park, Quincy, MA 02269-9101).
UNDERWRITERS LABORATORIES INC. (UL)
Standard 207 - Refrigerant Containing Components and Accessories, Nonelectrical
Standard 486 - Wire Connectors and Solder Lugs
(Application for copies should be addressed to the Underwriters Laboratories, Inc., 333 Pfingsten
Road, Northbrook, IL 60062-2096).
2.4 Order of precedence. In the event of a conflict between the text of this document and the
references cited herein, the text of this document takes precedence. Nothing in this document,
however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in
accordance with 4.1.1.
3.2 Design, materials, and manufacturing processes. Unless otherwise specified, the design,
materials, and manufacturing process selection is the prerogative of the contractor as long as all
articles submitted to the Government fully meet the requirements specified.
3.3 Operating requirements. Refrigeration units shall satisfy the following functional, operational
and performance requirements.
3.3.1 4-hour operation. Refrigeration units shall operate properly with suction and discharge
pressures safely controlled.
3.3.2 72-hour operation. Refrigeration units shall operate properly and maintain noted conditions
at thermostat settings of 00F and 350F.
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business