MIL-PRF-44035B
Title
Require-
Title
Require- Verification
Verification
Paragraph
ment
Paragraph
ment
Para
Para
OPERATING
3.2
4.3.2
Airflow
3.2.15
4.3.2.1
REQUIREMENTS
SUPPORT OR
3.3
4.3.3
4-hour operation
3.2.1
4.3.2.1
OWNERSHIP REQUIRE-
MENTS
72-hour operation
3.2.2
4.3.2.2
Transportability
3.3.1
4.3.3.1
Refrigeration capacity 3.2.3
4.3.2.3.2
Design
3.3.2
4.3.3.2
(00F)
reliability
Refrigeration capacity 3.2.3
4.3.2.3.3
Service and
3.3.3
4.3.3.3
(350F)
maintenance
Heating capacity
3.2.4
4.3.2.4
Marking
3.3.4
4.3.3.4
Defrost system
3.2.5
4.3.2.5
Interchangeability 3.3.5
4.3.3.5
Drainage system
3.2.6
4.3.2.6
Weight
3.3.6
4.3.3.6
ENVIRONMENTAL
Moisture content
3.2.7
4.3.2.1
3.4
4.3.4
REQUIREMENTS
Refrigerant leakage
3.2.8
4.3.2.1
Ambient
3.4.1
4.3.4.1
temperature
Control panel
3.2.9
4.3.2.7
Rainfall
3.4.2
4.3.4.2
Ozone-depleting
3.2.10
4.3.2.8
Shock
3.4.3
4.3.4.3
substances
Temperature control
3.2.11
4.3.2.9
Electromagnetic
3.4.4
4.3.4.4
compatibility
Power requirements
3.2.12
4.3.2.10
Storage
3.4.5
4.3.4.5
Power supply cable
3.2.12.1 4.3.2.10.1
Noise level
3.4.6
4.3.4.6
Lighting power supply
3.2.12.2 4.3.2.10.2
Corrosion
3.4.7
4.3.4.7
cable
resistance
INTERFACE AND
3.5
4.3.5
Finish
3.2.13
4.3.2.11
INTEROPERABILITY
REQUIREMENTS
Safety
3.2.14
4.3.2.12
Conformance inspection of the
4.1.2 Conformance inspection.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business