MIL-PRF-44035B
refrigeration units shall consist of all the verifications listed
in table I, except the verification testing specified for the
requirements of 3.2.2 through 3.2.6, 3.3.1, 3.3.2 and 3.4.1
through 3.4.7 shall not be done. Sampling for this inspection
shall be as specified in the contract or order (see 6.2).
4.2 Order of verifications. The verification tests listed in
table II shall be conducted in the sequence shown. All other
verifications listed in table I may be conducted in any sequence.
TABLE II. Verification test sequence
Sequence Requirement
Characteristic
Verification
Paragraph
Paragraph
1
3.2.1
4-hour operation
4.3.2.1
2
3.2.2
72-hour operation
4.3.2.2
3
3.2.3
Refrigeration
4.3.2.3.2 and
capacity
4.3.2.3.3
4
3.2.5
Defrost system
4.3.2.5
5
3.4.1
Ambient temperature
4.3.4.1
6
3.2.4
Heating capacity
4.3.2.4
7
3.4.3
Shock and vibration
4.3.4.3
8
3.3.1
Transportability
4.3.3.1
9
3.4.2
Rainfall
4.3.4.2
10
3.4.4
Electromagnetic
4.3.4.4
compatibility
11
3.4.5
Storage conditions
4.3.4.5
12
3.4.6
Noise level
4.3.4.6
13
3.2.6
Drainage
4.3.2.6
14
3.4.7
Corrosion resistance 4.3.4.7
15
3.3.2
Design reliability
4.3.3.2
4.3. Verification methods. Verification methods can include
visual examination, measurement, testing, simulation, modeling,
engineering evaluation, component properties analysis,
certification and similarity to previously-approved or
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business