MIL-PRF-12571R
TABLE I.
Verification methods
Title
Require-
Verification
Title
Require- Verification
ment
ment
3.2
4.3.2
Shelving
3.3.5
4.3.3.5
OPERATING
REQUIREMENTS
Heat leakage
3.2.1
4.3.2.1
Tie-down
3.3.6
4.3.3.6
assemblies
Safety
3.2.2
4.3.2.2
Marking
3.3.7
4.3.3.7
Drainage and
3.2.3
4.3.2.3
Identification
3.3.7.1
4.3.3.7.1
watertightness
plate data
Door
3.2.4
4.3.2.4
Marine Corps
3.3.7.2
4.3.3.7.2
identification
plate
Door handle and
3.2.5
4.3.2.5
Finish
3.3.8
4.3.3.8
latch
Electric power
3.2.6
4.3.2.6
Interchangeability 3.3.9
4.3.3.9
Interior light
3.2.6.1
4.3.2.6.1
Sanitary
3.3.10
4.3.3.10
requirements
Pilot light
3.2.6.2
4.3.2.6.2
3.4
4.3.4
ENVIRONMENTAL
REQUIREMENTS
Plug and receptacle
3.2.6.3
4.3.2.6.3
Shock and
3.4.1
4.3.4.1
vibration
Temperature
3.2.7
4.3.2.7
Weatherproof
3.4.2
4.3.4.2
indicator
Ozone-depleting and 3.2.8
4.3.2.8
Storage
3.4.3
4.3.4.3
hazardous substances
and toxic chemicals
SUPPORT OR OWNERSHIP 3.3
4.3.3
Corrosion
3.4.4
4.3.4.4
resistance
REQUIREMENTS
Storage capacity
3.3.1
4.3.3.1
Grounding for Navy 3.4.5
4.3.4.5
Transportability
3.3.2
4.3.3.2
3.5
4.3.5
INTERFACE AND
INTEROPERABILITY
REQUIREMENTS
Floor racks
3.3.3
4.3.3.3
Refrigerator
3.5.1
4.3.5.1
interface
Evaporator opening
3.3.4
4.3.3.4
Padlock
3.5.2
4.3.5.2
cover
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business